{"id":2358,"date":"2024-08-01T17:00:17","date_gmt":"2024-08-01T15:00:17","guid":{"rendered":"https:\/\/arenapower.com\/?p=2358"},"modified":"2025-04-23T14:20:53","modified_gmt":"2025-04-23T12:20:53","slug":"basalgo-wind-project-moves-ahead","status":"publish","type":"post","link":"https:\/\/arenapower.com\/es\/basalgo-wind-project-moves-ahead\/","title":{"rendered":"El proyecto e\u00f3lico de Basalgo avanza"},"content":{"rendered":"<p>The Basque Government\u2019s Department of Industry has confirmed that no alternative proposals were submitted during the public consultation period for the Basalgo wind farm project. As a result, Arena Power\u2019s \u201cArena Power Solar 10\u201d has been selected by default and now has six months to submit the required documents for initial administrative approval.<\/p>\n\n\n\n<p>The Basalgo project, located across the municipalities of Alto and Bajo Deba, involves the planned installation of six wind turbines with a total capacity of nearly 40 megawatts. This new development further strengthens Arena Group\u2019s presence in the renewable energy sector.<\/p>\n\n\n\n<p>Founded in 2018, Arena Group\u2014which includes Arena Power, Arena Green Power, Arena Green Assets, and Arena New Technologies\u2014focuses on the development of solar, wind, battery storage, and hydrogen energy projects. The company has expanded rapidly, with multiple offices across Spain, including a newly opened location in Bilbao in 2023.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>The Basque Government\u2019s Department of Industry has confirmed that no alternative proposals were submitted during the public consultation period for the Basalgo wind farm project. As a result, Arena Power\u2019s \u201cArena Power Solar 10\u201d has been selected by default and now has six months to submit the required documents for initial administrative approval. The Basalgo [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[10,12,45],"class_list":["post-2358","post","type-post","status-publish","format-standard","hentry","category-wind","tag-energy","tag-innovation","tag-wind"],"_links":{"self":[{"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/posts\/2358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/comments?post=2358"}],"version-history":[{"count":1,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/posts\/2358\/revisions"}],"predecessor-version":[{"id":2359,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/posts\/2358\/revisions\/2359"}],"wp:attachment":[{"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/media?parent=2358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/categories?post=2358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arenapower.com\/es\/wp-json\/wp\/v2\/tags?post=2358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}